Upgrading Crushing Facility from 150 to 500 TPH – PT.MADANI CITRA MANDIRI- BOSOWA Group

PT Madani Citra Mandiri – BOSOWA Group is currently undertaking a major capacity upgrade project at their crushing facility in Melak, East Kalimantan.

The scope of work includes the design, reconditioning, and supply of a new unit to upgrade the existing crusher from 150 TPH to 500 TPH, aiming to significantly boost production capacity and operational efficiency.

πŸ“ Location: Melak – East Kalimantan
πŸ—“οΈ Year: 2024

This ongoing project reflects our strong commitment to providing integrated engineering solutions that support the advancement of Indonesia’s mining industry with reliable and high-performance systems.

About the Author

You may also like these

Segala bentuk penyalinan tanpa izin atas isi ini merupakan pelanggaran hak cipta dan dapat dikenai sanksi hukum sesuai peraturan yang berlaku!